Project Description

Owner: Mr. Hassan Al Muhanna
Plot No.: C-005-019
Location: TECOM – Dubai
Consultant: M/s. Engineering Consortium
Main Contractor: M/s. Adnan Contracting
Total Connected Load: 2328 Kw
Total Bathrooms: 142 Units

Owner: Mr. Hassan Al Muhanna
Plot No.: C-005-019
Location: TECOM – Dubai
Consultant: M/s. Engineering Consortium
Main Contractor: M/s. Adnan Contracting
Total Connected Load: 2328 Kw
Total Bathrooms: 142 Units
Go To Top